Sheraton Bolin Tianrui Hotel is a super five-star business hotel built by Bolin Group in Shenzhen Xili University Town. The project is located at the intersection of Shahe West Road and Liuxian Avenue in Shenzhen, with a 360º view of the original ecology of Tanglang Mountain, which covers an area of 10 million square meters. Beautiful scenery, 40 million cubic meters of Xili Lake, 10 million square meters of university town campus, overlooking
1.3 million square meters of golf green space. Hotel Package Large indoor and outdoor heated swimming pool, swimming pool area Accumulate about 2,000 square meters to build the first water stand in the country Fang sightseeing swimming pool luxury club, fully transparent material The application of the space to realize the flow, form a room Interaction between the inner and outer pools. Day and night, The swimming pools are crystal-like in the field of vision.
Luxurious in the light. It consists of two boundless tops and bottoms The swimming pool is superimposed, the pool water area is 1773 ㎡, the depth of pool water is 0.5-1.5 m, and the volume of pool water is 2300 m³。
Swimming pool system undertakes content: Equipment supply, transportation, loading and unloading, installation, engineering construction, acceptance inspection, warranty, etc. of dehumidification system and water treatment system of indoor and outdoor constant temperature swimming pool installation projects, including installation and debugging of piping system.
Swimming pool system undertakes content: Equipment supply, transportation, loading and unloading, installation, engineering construction, acceptance inspection, warranty, etc. of dehumidification system and water treatment system of indoor and outdoor constant temperature swimming pool installation projects, including installation and debugging of piping system.
Project Features:
Engineering Quality Requirements
High, the construction is difficult. The construction of each tender section is carried out at the same time, and the construction of various professions is carried out at the same time. There are many cross-operations, and coordination of various aspects is required, and the installation project can be completed on schedule without affecting the contracting party and the surrounding environment. Effective safety precautions have been taken, especially safe electricity use and fire prevention measures, while on-site civilized construction management has been strengthened. According to the construction progress, the operators were adjusted in a timely manner, and when necessary, overtime and three-shift operation methods were adopted to rush the progress, ensure the quality, and create excellence. The outdoor swimming pool is an infinity pool with irregular landscape and an indoor semi-standard pool, which is divided into adult pool, children pool and leisure pool. Bubble pool and dry temperature steam room. The swimming pool adopts a counter-current circulation method, the water treatment is a sand tank filtration and a full-flow ozone disinfection system, the circulation period is 6 hours, and the initial heating time is 24 hours。
Design standard: The total water area of the indoor and outdoor swimming pools is 1773 square meters; the water depth of the children’s pool: 0.5 m;
The depth of the pool water is 0.5-1.5 m; the depth of the pool area: 0.75m:
The pool water volume is 2300m³; PLC and touch screen realize the whole system Water depth in shallow water area is 0.2 m; Fully automatic control.